SAP Database - The Unofficial SAP Knowledge Base

Hi Guest!
You can contribute to SAP Database on any topic. SAP Database might be the right place for your Ideas/Opinions to reach a larger audience.

SAP Forums

New to SAP Database? Register Now
Already a member? Login
Social Bookmarks:

Avaliable Views for Material Master

Print This Post Email This Post Written by rajivsharma.sap on Jan 2nd, 2009 | Filed under: Material Management (MM)

The material type selected controls the views possible for material.

For a material to be used in the system it needs to be created for each plant. Multiple views of a material are possible but at a minimum, the material needs to have a description and a base unit of measure assigned on the basic data view. Additional department views (i.e. Accounting, Sales,  Purchasing, MRP, Warehouse) can be added at a later time by extending the material. As additional plants are added, a material will need to be extended to the plants before it can be used there.

If you like this post, you may as well like these too:

  1. Material Master Training Reference The material master contai
  2. What is the difference between a PR with a Master Record and without a Master Record for the material being ordered? If the master record exist
  3. How do you change the standard price in the Material Master? The standard price in the
  4. Set User Defaults For Views and Organizational Level The user defaults for view
  5. Material Master Configuration and EP Understand about enterpris



Leave a Reply